PEA STUDIOS

Home

Welcome

Overview

House instruments

Other gear

Coming soon

Rates

PEA Studios progress

Links

"From start to finish"

Studio Progress page 1
    Page 2

    Page 3

    Page 4

    Page 5
Studio progress

Thanks for stopping by to check out our progress...little by little we tackle each part.
Every step of the way is a new adventure...one I am enjoying immensely...always a challenge but I have great help and I am grateful for that.


Had to make some decisions on the room...wood floor, very expensive...soft wall throughout...hard wall? Could I have a pure, painted concrete floor? After offering sound samples to trusted ears, I will be going with painted concrete floor and half soft, half exposed painted dry-wall.

Room acoustics

I had GIK Acoustics make 5 bass traps and 6 mid traps to help flatten the EQ in the room...can't wait to open these boxes!
Take it down

The maroon-ish burlap material on the back and side wall plus the ceiling
had to come off. Plus the carpet on the floor has been pulled away and was taken out.

Fill it in

The burlap material and carpet are gone...time to spackle the nail and dry-wall screw holes in the wall.
We will be adding a second layer of putty/spackle, letting it dry and then sanding...will seal the drywall to prepare it for painting.
The mess

A lot of what is being done to PEA Studios has displaced a lot of equipment.
    Page 2

    Page 3

    Page 4

    Page 5
PEA STUDIOS, Appleton, WI      U.S.A.
Contact for general questions: info@peastudios.com


Website powered by Network Solutions®